Another Hollywood Rip, Ride, Rockit update was posted to OrlandoRocks.com. The loop has about 3 sections left to go and definitely will be complete this week. The twist in the top of the loop has started to take shape and looks like it will be an exciting element in addition to being great to look at.
Hollywood Rip Ride Rockit Loop Watch
This entry was posted in Roller Coasters and tagged Construction, Hollywood Rip Ride Rockit, New Rides 2009, Universal Studios, Universal Studios Orlando. Bookmark the permalink.
