A plethora of new Terminator Salvation photos have been added to Theme Park Review. The ride is really coming together and the lifthill is nearing completion. Track-work has ramped up (the actual metal track I believe) and I have no doubt they’ll be able to start testing within a month.
Terminator Salvation Construction
This entry was posted in Roller Coasters and tagged Construction, New Rides 2009, Six Flags, Six Flags Magic Mountain, Terminator Salvation: The Ride. Bookmark the permalink.